Stainless steel tank tank top door with cold shirt
Upper door tank with cold jacket made of stainless steel 304. Possibility of manufacturing it in stainless steel 316 It has a cold jacket to regulate the temperature during the fermentation or conservation process. This model is manufactured to order, approximately 15 - 20 days to manufacture it.
Includes
- Stainless steel ball valve, clearing outlet.
- Stainless steel ball valve, turbid outlet.
- Upper Door
- Cold shirt
- Airlock valve.
- Capacity level viewer.
- 3 Legs
-
Custom manufacturing + 2000 liters
Reviews
Not yet reviewed