Multidirectional Scaffolding Dacame Meka 48 135m2
The MEKA 48 multidirectional scaffolding is designed to meet the most complex assembly needs. Its great Loading capacity and a wide range of parts they give it versatility of use, allowing adaptation from the same to the structures traditional difficult. Dispose of safety railing permanent to guarantee the safety of the user at all times.
Manufactured in accordance with European standards:
- UNE-EN 12810
- UNE-EN 12811
- Cert. A34 / 000022
Technical Specifications
Steel tube Ø 48,3 mm quality ST-44
Finish:
- Galvanized hot according to UNE-EN 1461 with a minimum thickness of 75 microns
The MEKA 48 improves the concept of scaffolding manufactured using tubes and flanges. his technical superiority It is based on vertical joints, which allow up to 8 connections in a horizontal or vertical plane, at right angles, acute or obtuse. This allows a three-dimensional assembly of the scaffold in length, width and height, which gives this scaffolding system its maximum assembly efficiency on complex work surfaces.
The MEKA 48 multidirectional scaffold system features a wide range of parts complementary that increase their effectiveness and adaptability, in addition the design of the same guarantees user safety both during assembly and during use.
Modular
Modular | Reference | Quantity |
Spindle Base Diam. 36 (500) | 025010108 | 10 |
Initiator Meka 48 (GA) | 219900010 | 10 |
Vertical foot Meka 48 3000 (GA) | 210100300 | 7 |
Vertical foot Meka 48 2000 (GA) | 210100200 | 33 |
Horizontal stringer Meka 48 700 (GA) | 210200072 | 41 |
Horizontal stringer Meka 48 2000 (GA) | 210200202 | 28 |
Horizontal stringer Meka 48 3000 (GA) | 210200302 | 28 |
Diagonal Meka 48 2000 x 3000 (GA) | 210320302 | 4 |
Platforms
Platforms | Reference | Quantity |
Fixed platform (M48 / D48) 3000 C-4 (GA) | 210530300 | 8 |
Fixed platform (M48 / D48) 2000 C-4 (GA) | 210530200 | 16 |
Platform C / Trampilla M48 / D48 C-4 3000 (MD / AL) | 210600300 | 4 |
Platform ladder (AL) | 240920000 | 4 |
Ladder Support (GA) | 212390010 | 1 |
Skirting
Skirting | Reference | Quantity |
Skirting board M48 / D48 700 (MD) | 210800070 | 8 |
Skirting board M48 / D48 3000 (MD) | 210800300 | 8 |
Skirting board M48 / D48 2000 (MD) | 210800200 | 8 |
Nomenclature
1. Spindle base | 13. Lattice beam |
2. Reinforced wall console | 14. Fixed metal platform |
3. Flange spindle | 15. Access platform |
4. Initiator | 16. Platform ladder |
5. Vertical foot | 17. Skirting |
6. Mounting rail | 18. Bracket |
7. Standard handrail | 19. Mooring |
8. Side railing | 20. Provisional mounting railing |
9. Diagonal | 21. Visor protection |
10. Horizontal stringer | 22. Access ladder |
11. Reinforced stringer | 23. Outdoor railing |
12. Spigot with flange | 24. Interior railing |
See specific parts of the Dacame MEKA 48 scaffolding
Assembly sequence
1 | Place the spindle bases on the ground, starting at the highest point. Depending on the terrain, it is advisable to use partition plates to distribute the load transmitted to the ground. On each spindle base introduce the initiator. | 2 | Connect the initiators by means of the horizontal beams, using the small holes of the rosettes. It will proceed to the leveling of the spindle bases, starting from the highest point. |
3 | Insert the vertical feet into the initiators, to assemble the first level:
|
4 | Assemble the work platforms as well as the access platform, supporting the access ladder on the ladder support attached to the horizontal crossbar. Strengthen the scaffolding, mounting the diagonal. |
5 | By using the provisional mounting rail, we can access the first platform level, from there mount the side protection, consisting of horizontal stringers and skirting boards. | 6 | Assemble the next level (and the following ones) with vertical feet of 2 m and join them with horizontal beams, as has been done in step 3. |
7 | Place the next level of platforms, as well as continue with the diagonalization of the scaffolding. Bracing the scaffolding to the façade, using tie-rods, fixed flanges, plugs and hooks. | 8 | Complete the side protection by mounting the horizontal beams and platforms. For the assembly of more levels, steps 6, 7, 8 must be repeated. |
Reviews
Not yet reviewed